Nearly Able to Walk on the Sidewalk at NW 10th & Davis

It’s been a very long haul, as I posted about this corner back before the building was torn down, but the sidewalk is very nearly open! It looks like they were doing the demo in June of 2017, which means it has been nearly three years since this street and sidewalk have been navigable for anything other than construction workers.

Reporting from seven months in the future, I can say that I’ve still not walked on that sidewalk. A few days after I took this picture, we were told to work from home and two days after that we were told our positions would be eliminated as of March 31.

Having no office to go to any longer, this corner is not on my daily route. I’m pretty sure the sidewalk is open now, but who knows?

2 thoughts on “Nearly Able to Walk on the Sidewalk at NW 10th & Davis”

Leave a Reply

Your email address will not be published. Required fields are marked *